BHS Volunteer Meeting Minutes
March 2, 2007
Meeting called to order 9:00
Introductions
were made.
VICE
PRESIDENT’S REPORT: Ronda
Building Update: The chair lift in the business wing passed
final inspection. Keys are being made now that can be issued
to students who need the lift. Staff and students will be
trained on its use.
New
student center furniture will be arriving around spring
break.
Bookshelves
are being constructed to hold the math textbooks.
This
is a new language arts textbook adoption year. We are looking
at ways to orchestrate a smooth transition.
We
have established a PE committee for bond facilities which
includes staff and architects. They will look at physical
education needs first and athletics second. Title 9 (gender
equity) issues will be dealt with. Construction will begin
in the spring of ’08 and be completed in the fall
of ’08.
BHS
Visioning Committee continues to meet and formulate proposals
for the future of Beaverton High School including Merle
Davies.
Instructional
Engineers continue to work with us on the new cafeteria.
Surface cracks are appearing on both the inside and the
outside of the building, but none of them go all the way
through. They are looking at the construction and confirming
that all was done correctly. The building is still totally
safe.
All
work orders have been completed for the fire marshal and
the district safety officer.
The air quality was checked on the portables after a report
from a parent that her daughter was not feeling well after
attending a class in one of the portables. It was determined
that more outside air was needed to circulate through the
portables, so that was taken care of. Teachers will keep
the fans on the heating and cooling system running during
school time.
There
is a district wide review of the Valedictorian/Salutatorian
selection process for next year. It is likely there will
be only one of each based on student’s cumulative
weighted grade point average.